Concrete Placing Boom Boom length based primarily on points, 12M-45M, mainly from cloth role, mainly used in the construction machinery of large bridges, concrete pump output from fabric to Placing Boom concrete conveying it to the work surface
Mobile Hydraulic Concrete Placing Boom:
It can be placed according to needs of field pouring.
Compact structure, light weight, and can be hoisted and transported as a whole.
Flexible, widely use and applicable for complex construction site.
Easy operation, safe and reliable, economical and practical.
Manual concrete placing boom Features:
Use the second knuckle arm horizontal folding way, manual operation, flexible and high safety.
Specially used in the occasion of building wall and pillar where the Steel plate is outstanding.
The weight is light,convenient to move to with tower crane.
1.Concrete placing boom is a new product developed for enlarging the range of concrete pouring and improving the mechanization level of pumping construction.
2 placing boom should maintain a certain distance from the high-voltage lines and electrical appliances.
3 ends pouring hose must fasten safety rope, prohibit the use of the end of the hose lengths over 3 m pouring hose shall be inserted poured concrete in strict accordance Placing Boom range.
4 Placing Boom at work beneath the boom allowed to stand.
5 hydraulic system pressure must not exceed 25Mpa.
6 Do not open the pipe joints in the duct and the pressure within the tubing.
7 Do the ends of the hose removed, so that the boom and the other rigid delivery pipeline connection.
8 rotation during braking or do the reverse operation is prohibited when the equipment machinery is not completely stopped. Swivel connector ferrule can not be fixed at too tight, ensuring flexible rotation per shift to be cleaned lubricated rotary joint pipe clamp seal once.
9 repair or maintenance, you should cut off the ground supply, repair and maintenance are not allowed to live.
10 work at the end of the boom must be close together, hang hook, the arm horizontally, cut off the power supply ground